Saturday, November 28, 2009

CJ - Day 9

Check out the steps we worked through...



This session was about 45 minutes long. I made the practice shafts out of two ten foot long PVC pipes. CJ threatened to kick at them at first, but it took very little time for him to get used to them bumping against his sides.

Next, we'll be making a stone boat which wooden shafts will attach to. We'll have him pull the stone boat in a straight line first and help him pull the weight of it around the corners. When he's doing well with the stone boat, we should be able to hook him to the sleigh without worry of him kicking it.

No comments:

Post a Comment